Details

  • Low build epoxy.
  • Superb wear and chemical resistance.
  • Best for sealing previously placed epoxy mortar overlay without changing the texture of the existing mortar.
  • Recommended for a topcoating/sealing epoxy mortar power troweled systems or hand troweled systems.
  • Two component 100% solids epoxy.
  • Primer is required. Use over an Epoxy Mortar Overlay System.

More Information

More Information
Application Primer
VOC Compliant No VOC Content
Light Foot Traffic 14-18 Hours
Primer Required (Use over Epoxy Mortar Overlay System)
Pot Life at 70 Degrees 20-30 Minutes
Recoat Time at 70 Degrees 9-14 Hours
Full Cure (Heavy Traffic) 2-7 Days
Approximate Coverage 267 Sq Ft @ 6 Mil Wet

Technical Specifications